Timelines

How long does it take to build a website? Real timelines in 2026.

From 7 business days to 4 months, what determines your project timeline, the five phases every website goes through, and what really delays the launch (spoiler: it is almost never the coding).

Nuno Costa ✦ ✦ 4 min read
Quick answer

In 2026, a landing page takes 2–3 weeks, a brochure website 4–6 weeks, an online store 6–10 weeks and a web app 8–16 weeks. The clock starts when your content arrives, texts, photos and logo, and what delays projects most is not the coding: it is gathering materials and slow feedback.

Project typeTypical timelineWith everything ready
Landing page2–3 weeks5–7 business days
Brochure website4–6 weeks7–14 business days
Online store6–10 weeks3–4 weeks
Web app / platform8–16 weeks4–8 weeks

Swipe the table sideways →

Timelines in business days/weeks, counted from receipt of all materials, the Portuguese market standard, and the one used in Nuno Costa’s projects.

( 01 )

Why do timelines vary so much?

The difference between "1 week" and "4 months" is not work quality; it is scope. A landing page has one goal, one page and a small set of decisions. A web app has users, permissions, databases and use cases that must be thought through, designed and tested. More decisions mean more weeks; which is why nobody serious can promise "your system in 7 days".

The second factor is you, in the best sense. Every website timeline runs from receipt of the materials: texts, photographs, logo and access credentials. A project with everything ready starts the next day; a project waiting for content does not start at all.

( 02 )

The five phases of any website

Regardless of project type, the path is always the same. Know the phases, and how much each one weighs on the timeline:

  1. Discovery and strategy (2–5 days). Goal, audience, page structure and references. It is the cheapest phase and the one that saves the most time later.
  2. Content (in parallel, the wildcard). Texts, photos and logo. When the client already has them, this phase does not exist; when they do not, it doubles the timeline.
  3. Design (3–10 days). Layout of the home page and key pages, with one or two revision rounds agreed in the quote.
  4. Development (5–20 days). Turning the design into a fast, responsive, SEO-optimised website, with forms, integrations and tests on real devices.
  5. Launch (1–2 days). Domain, hosting, SSL certificate, search engines and analytics. After this, the site is live, and starts working.
( 03 )

What really delays projects

After dozens of projects, the pattern is unavoidable. The four most common delays rarely have anything to do with code:

  • Late materials. The classic: "the clock starts when everything arrives" is forgotten by week three. Without texts and photos, there is nothing to design.
  • Decisions by committee. Every version reviewed by five people multiplies the feedback, and contradictory feedback is what makes a project spin in place.
  • Scope changes. "What if it also had a store?" is a legitimate question, but mid-project it means reopening closed phases, and that costs time and money.
  • Vague feedback. "I do not know, take a look at it" cannot be answered. "The button should sit above the text and be orange" is solved in minutes.
( 04 )

How to speed up your project

  1. Name a single decision-maker, one person who aggregates opinions and answers for the client.
  2. Deliver the materials at the start: texts in a document, photos in original files, logo as a vector, domain and social access credentials.
  3. Answer feedback in aggregate: a single email per revision round with everything flagged. Feedback in fragments, across different channels, gets lost.
  4. Ship version 1. Perfect is the enemy of launched: the first version exists to start measuring real results, everything else is continuous evolution.

In a real hurry? Subscription websites go live in 7–14 business days, with a professional template adapted to your brand and revisions included, the shortest path between decision and launch. I break the model down in the website subscription guide.

A real timeline for your project?

Describe what you need and receive a phase-by-phase timeline, plus what you can do today to shorten it. Reply in under 24 hours.

Request a free quote
( 05 )

FAQ: website timelines

How long does it take to build a landing page?
One to two weeks from receipt of content. With materials ready and quick feedback, it can launch in 5 to 7 business days.
How long does a brochure website take?
Typically 2 to 6 weeks, depending on the number of pages, whether content is ready and the agreed revision rounds. Subscription websites with an adapted template go live in 7–14 business days.
How long does it take to build an online store?
Four to ten weeks: product catalogue, payments (Stripe, MB Way, Multibanco), shipping and end-to-end order testing are what add time compared to a brochure site. With products, copy and photos ready, 3–4 weeks is realistic.
What makes a website take longer?
Late content delivery, slow collective decisions, mid-project scope changes and vague feedback. The coding itself is rarely the bottleneck.
How can I speed up my project?
Name a single decision-maker, gather all materials before starting, answer feedback in aggregate per round, and launch version 1 without waiting for perfection.
Is a fast website necessarily a bad one?
No. Fast is bad when it skips strategy and testing, not when the scope is well defined. Landing pages and professional-template subscriptions are fast precisely because they eliminate decisions that do not affect the result. See also how much a website costs.